Client : University of Edinburgh
Location : Easter Bush Campus
Value : £350k
The project saw the conversion and alteration of an existing external kennel space to form new high-spec isolation Kennels for the University team at the Small Animal Hospital.
After undertaking demolition and strip out works new bespoke isolation pods were installed. These were insulated units which had individually controlled heating and ventilation systems installed to ensure the maximum comfort for the animals. The kennels could be maintained and controlled remotely and were designed to withstand robust cleaning and de-contamination processes.
New drainage was installed in the existing concrete floor to accommodate “ cleaning out”, with specialist floor screeds and hygienic wall cladding being installed.
The main University facility remained live throughout the construction phase and safe segregation of our works and regular communication with staff representatives was essential to ensure the safe delivery of the project.