PMC Commercial Ltd have had a very busy summer, which has seen us hand over the following three projects.
1 Food Production Facility – Central Belt
This project comprised of the removal of existing mezzanine floors, chill room and industrial, to make way for 2 No. larger Mezzanine floors and 1 No. large chiller unit.
The facility remained live through the construction phase and safe segregation of the works as well as compliance with the client’s strict hygiene protocols was essential to ensure that the project was delivered safely on time and to the quality expected by the client and the design team.
2 Hurlford Parish Church – Fire reinstatement works
This project comprised of the full reinstatement of a fire damaged church hall, which consisted of a new roof structure including new slates, leadwork, and cast-iron rainwater goods.
Internally, the entire timber floor structure had to be replaced, and a new hard-wood floor installed. The Walls and ceilings were re-lined, and the design team took the opportunity to improve the thermal efficiency of the building by installing improved levels of insulation.
Mechanical, plumbing and electrical systems were re-installed with an improved ventilation system for the hall forming part of the works.
3 Student Accommodation Dundee
This project comprised of the alteration of existing rooms to form new DDA compliant rooms. The existing rooms had the existing prefabricated toilet pods removed, door openings improved new kitchen layouts installed as well as a full re-decoration.
In addition to this we upgraded the existing car park area and undertook fire-protection works to an adjoining unit.